Installation Guide for Holset He351ve 13b Single Turbo on Rotary Engines

The Holset HE351VE 13B single turbo is a popular choice for rotary engine enthusiasts looking to enhance performance. This guide provides a step-by-step installation process to help you successfully install this turbocharger on your rotary engine.

Tools and Materials Needed

  • Holset HE351VE 13B Turbocharger
  • Turbocharger installation kit
  • Basic hand tools (wrenches, sockets, etc.)
  • Torque wrench
  • Silicone hose connectors
  • Oil feed and return lines
  • Intercooler (optional)
  • Boost gauge
  • Vacuum gauge

Preparation Steps

Before beginning the installation, ensure that you have all the necessary tools and materials. It is also important to prepare your workspace for a smooth installation process.

1. Disconnect the Battery

Start by disconnecting the negative terminal of the battery to prevent any electrical short circuits during the installation.

2. Remove Existing Components

Remove any existing turbocharger or components that may obstruct the installation of the Holset HE351VE. This may include exhaust manifolds, intercooler piping, and intake components.

Installing the Holset HE351VE Turbocharger

Follow these steps to install the Holset HE351VE turbocharger onto your rotary engine.

1. Install the Turbocharger

Position the turbocharger onto the exhaust manifold. Ensure that the mounting holes align correctly. Use the provided bolts to secure the turbocharger in place, following the manufacturer’s torque specifications.

2. Connect Oil Lines

Attach the oil feed line to the turbocharger, ensuring a secure connection. Then, connect the oil return line to the designated outlet on the engine. Make sure all connections are tight to prevent oil leaks.

3. Install Intake and Exhaust Piping

Connect the intake piping to the turbocharger, and then route it to the intake manifold. If using an intercooler, ensure that the piping is properly connected to both the turbocharger and the intercooler. Secure all connections with clamps.

4. Install the Wastegate Actuator

Mount the wastegate actuator according to the manufacturer’s instructions. Ensure that the actuator arm moves freely and that it is properly connected to the wastegate.

Finalizing the Installation

Once the turbocharger is installed, complete the following steps to finalize the installation.

1. Check All Connections

Go through all connections to ensure they are tight and secure. This includes oil lines, intake, exhaust, and any other components that were installed.

2. Reconnect the Battery

Reconnect the negative terminal of the battery. Ensure that all tools and materials are cleared from the engine bay before starting the vehicle.

3. Start the Engine

Start the engine and allow it to idle for a few minutes. Monitor for any unusual noises or leaks. Check the oil pressure to ensure proper operation of the turbocharger.

4. Test Drive

After confirming that everything is functioning correctly, take the vehicle for a test drive. Monitor boost levels and engine performance during the drive.

Maintenance Tips

To ensure the longevity and performance of your Holset HE351VE turbocharger, follow these maintenance tips.

  • Regularly check oil levels and quality.
  • Inspect all connections for leaks and wear.
  • Keep the intake and exhaust systems clean.
  • Monitor boost levels and adjust as necessary.
  • Schedule regular maintenance for your rotary engine.

Conclusion

Installing a Holset HE351VE 13B single turbo on a rotary engine can significantly improve performance. By following this guide, you can ensure a successful installation and enjoy the benefits of your new turbocharger.