Table of Contents
The HKS SSQV Blow Off Valve is a popular upgrade for Nissan GT-R enthusiasts looking to enhance their vehicle’s performance. This guide will walk you through the step-by-step installation process for the HKS SSQV Blow Off Valve on a Nissan GT-R with 600 horsepower.
Tools and Materials Needed
- HKS SSQV Blow Off Valve Kit
- Socket set
- Wrenches
- Screwdriver set
- Vacuum hose
- Clamps
- Torque wrench
- Safety glasses
- Gloves
Preparation Steps
Before starting the installation, ensure that you have all the necessary tools and materials at hand. Follow these preparation steps to get ready:
- Park the Nissan GT-R on a flat surface.
- Disconnect the battery to prevent any electrical issues.
- Allow the engine to cool completely if it has been running.
Removing the Stock Blow Off Valve
The first step in the installation process is to remove the stock blow off valve. Follow these steps:
- Locate the stock blow off valve on the intake piping.
- Remove the clamps securing the intake piping using a screwdriver or socket.
- Disconnect any vacuum hoses attached to the stock blow off valve.
- Unscrew the bolts holding the stock blow off valve in place and carefully remove it.
Installing the HKS SSQV Blow Off Valve
Once the stock valve is removed, it’s time to install the HKS SSQV Blow Off Valve. Follow these steps:
- Position the HKS SSQV blow off valve in the same location as the stock valve.
- Secure the valve using the provided bolts and a torque wrench to ensure proper tightness.
- Reconnect the vacuum hose to the HKS SSQV valve.
- Attach the intake piping back onto the valve and secure it with clamps.
Finalizing the Installation
After the HKS SSQV Blow Off Valve is securely in place, you need to finalize the installation. Follow these steps:
- Double-check all connections and ensure everything is tightened properly.
- Reconnect the battery.
- Start the engine and check for any leaks around the blow off valve and intake piping.
- Listen for the characteristic sound of the blow off valve when revving the engine.
Testing the Blow Off Valve
Once the installation is complete, it’s important to test the blow off valve to ensure it operates correctly. Follow these steps:
- Take the car for a short drive, paying attention to the performance.
- Monitor the boost levels and ensure they are within the expected range.
- Check for any unusual sounds or performance issues.
Conclusion
Installing the HKS SSQV Blow Off Valve on your Nissan GT-R can significantly enhance the driving experience by improving throttle response and providing that iconic sound. By following this step-by-step guide, you can ensure a successful installation and enjoy the benefits of your new performance upgrade.