Table of Contents
The installation of AWE Tuning GT-R downpipes is a crucial step for those looking to enhance their vehicle’s performance. This guide provides a comprehensive, step-by-step approach to ensure a successful installation.
Tools and Materials Needed
- Socket set (including deep sockets)
- Torque wrench
- Ratchet
- Extension bars
- Jack and jack stands
- Safety goggles
- Gloves
- New gaskets (if required)
- Penetrating oil
Preparation Steps
Before beginning the installation, ensure that you have all the necessary tools and materials at hand. It is also advisable to work in a well-ventilated area to avoid inhaling fumes.
Make sure to wear safety goggles and gloves to protect yourself during the installation process.
Step-by-Step Installation Process
Step 1: Lift the Vehicle
Using a jack, lift the vehicle and secure it with jack stands. Ensure that the vehicle is stable before proceeding.
Step 2: Remove the Undertray
Locate and remove the undertray to access the downpipes. This may require removing several screws or bolts.
Step 3: Disconnect the Exhaust System
Loosen the clamps and bolts connecting the exhaust system to the downpipes. If necessary, use penetrating oil to help loosen rusted bolts.
Step 4: Remove the Stock Downpipes
Carefully remove the stock downpipes from the vehicle. This may require maneuvering them out of tight spaces.
Step 5: Install AWE Tuning Downpipes
Position the new AWE Tuning downpipes into place. Ensure that they fit snugly and align with the exhaust system.
Step 6: Secure the Downpipes
Using the provided hardware, secure the downpipes in place. Make sure to follow the manufacturer’s torque specifications for each bolt and clamp.
Step 7: Reconnect the Exhaust System
Reattach the exhaust system to the new downpipes, ensuring all connections are tight and secure.
Step 8: Reinstall the Undertray
Once everything is securely in place, reinstall the undertray to protect the components underneath the vehicle.
Step 9: Lower the Vehicle
Carefully lower the vehicle back to the ground using the jack. Ensure everything is clear before removing the jack stands.
Post-Installation Checks
After installation, it is essential to perform a few checks to ensure everything is functioning correctly. Start the vehicle and listen for any unusual sounds.
- Check for any exhaust leaks.
- Inspect the connections to ensure they are tight.
- Monitor the vehicle’s performance during a test drive.
Conclusion
Installing AWE Tuning GT-R downpipes can significantly enhance your vehicle’s performance. By following this step-by-step guide, you can ensure a successful installation and enjoy the benefits of improved exhaust flow and power.