Diy Camshaft Installation: Step-by-step with Trick Flow Stage 2 Cam for 35-50 Hp Gains

Installing a camshaft can significantly improve your vehicle’s performance, especially when opting for a high-performance cam like the Trick Flow Stage 2. This guide will provide you with a step-by-step process to install the camshaft and achieve gains of 35-50 horsepower.

Tools and Materials Needed

  • Trick Flow Stage 2 Camshaft
  • Socket set and wrenches
  • Torque wrench
  • Camshaft installation tool
  • Engine oil
  • Grease
  • Timing chain or belt
  • Gasket set
  • Safety glasses
  • Mechanic’s gloves

Preparation Steps

Before starting the installation, ensure that you have a clean workspace and all tools organized. Follow these preparation steps:

  • Disconnect the battery to prevent any electrical issues.
  • Remove any components obstructing access to the camshaft, such as the intake manifold, valve covers, and timing cover.
  • Drain the engine oil to prevent spills during the installation.

Removing the Old Camshaft

With the engine prepped, it’s time to remove the old camshaft. Follow these steps:

  • Mark the position of the timing chain or belt to ensure correct alignment during reinstallation.
  • Remove the timing chain or belt, taking care not to damage any components.
  • Unbolt the old camshaft using the socket set and carefully slide it out of the engine.

Installing the Trick Flow Stage 2 Camshaft

Now that the old camshaft is out, you can install the new Trick Flow Stage 2 camshaft. Here’s how:

  • Apply a light coat of engine oil to the new camshaft’s bearings and lobes.
  • Carefully slide the new camshaft into place, ensuring it aligns with the timing marks.
  • Secure the camshaft by tightening the bolts to the manufacturer’s specified torque settings.

Reinstalling Timing Components

With the camshaft installed, it’s time to reinstall the timing components:

  • Reattach the timing chain or belt, ensuring it is aligned correctly with the marked positions.
  • Double-check the alignment before tightening the tensioner.
  • Install any gaskets and covers that were removed during disassembly.

Final Steps and Testing

After everything is reassembled, follow these final steps:

  • Refill the engine with fresh oil and replace the oil filter.
  • Reconnect the battery and check all connections for security.
  • Start the engine and listen for any unusual noises, ensuring everything is functioning correctly.
  • Take the vehicle for a test drive to experience the performance gains.

Conclusion

Installing the Trick Flow Stage 2 camshaft can lead to significant horsepower gains. By following this step-by-step guide, you can successfully enhance your vehicle’s performance while enjoying the satisfaction of a DIY project.