How to Install a Nismo Camshaft Upgrade on Your Datsun 240z: Step-by-step Guide

Upgrading your Datsun 240Z with a Nismo camshaft can significantly enhance its performance. This step-by-step guide will walk you through the installation process, ensuring you can achieve a successful upgrade with ease.

Materials Needed

  • Nismo camshaft
  • Socket set
  • Torque wrench
  • Engine oil
  • Gasket sealant
  • Timing chain tool
  • Oil filter
  • New gaskets

Preparation Steps

Before starting the installation, ensure you have all the necessary materials and tools ready. It’s also important to work in a well-ventilated area and have safety gear on hand.

1. Disconnect the Battery

Begin by disconnecting the battery terminals to prevent any electrical issues during the installation process.

2. Drain Engine Oil

Next, drain the engine oil to avoid any spills when removing the camshaft. Make sure to dispose of the oil properly.

Removing the Old Camshaft

With the preparation complete, it’s time to remove the old camshaft from your Datsun 240Z.

1. Remove the Valve Cover

Start by removing the valve cover bolts using a socket wrench. Carefully lift the valve cover off, taking care not to damage the gasket.

2. Remove the Timing Chain

Use the timing chain tool to remove the timing chain. Make sure to keep track of the chain’s orientation for reinstallation.

3. Take Out the Old Camshaft

Once the timing chain is removed, unbolt the old camshaft from its position and gently lift it out of the engine block.

Installing the Nismo Camshaft

Now that the old camshaft is out, it’s time to install the new Nismo camshaft.

1. Prepare the New Camshaft

Before installation, apply a small amount of engine oil to the bearings of the new camshaft to ensure proper lubrication.

2. Insert the New Camshaft

Carefully place the new Nismo camshaft into the engine block, aligning it with the bearing caps. Ensure that it is seated properly.

3. Bolt Down the Camshaft

Using the torque wrench, tighten the camshaft bolts to the manufacturer’s specifications to ensure a secure fit.

Reassembly Process

With the new camshaft installed, you can begin reassembling the components you removed earlier.

1. Reinstall the Timing Chain

Reattach the timing chain, ensuring it is aligned correctly with the camshaft and crankshaft gears.

2. Replace the Valve Cover

After the timing chain is secured, place the valve cover back on, applying gasket sealant where necessary to prevent leaks.

3. Reconnect the Battery

Finally, reconnect the battery terminals and ensure everything is securely fastened.

Final Steps

Before starting your engine, double-check that all components are installed correctly and that no tools are left in the engine bay.

1. Fill with Engine Oil

Fill the engine with fresh engine oil and replace the oil filter to ensure optimal performance.

2. Start the Engine

Start your Datsun 240Z and let it idle for a few minutes. Listen for any unusual sounds and check for oil leaks.

Conclusion

Upgrading to a Nismo camshaft can greatly improve the performance of your Datsun 240Z. By following this step-by-step guide, you can ensure a successful installation and enjoy the enhanced driving experience.