How to Install Edelbrock Performer Rpm Cam on Your Chevy 350: Step-by-step Guide

Installing the Edelbrock Performer RPM Cam on your Chevy 350 can enhance your engine’s performance significantly. This step-by-step guide will walk you through the entire installation process, ensuring that you can complete the task efficiently and effectively.

Tools and Materials Needed

  • Edelbrock Performer RPM Cam
  • Socket set
  • Torque wrench
  • Engine oil
  • Camshaft lubricant
  • Gasket scraper
  • Rags
  • Safety goggles
  • Gloves

Preparation Steps

Before starting the installation, it is crucial to prepare your workspace and the engine. Follow these steps to ensure you are ready:

  • Park the vehicle on a level surface and engage the parking brake.
  • Disconnect the negative battery terminal to prevent any electrical issues.
  • Remove any components obstructing access to the camshaft, such as the intake manifold and valve covers.
  • Clean the engine surfaces thoroughly to remove old gasket material and debris.

Removing the Old Camshaft

To install the new camshaft, you must first remove the old one. Follow these steps:

  • Rotate the engine to TDC (Top Dead Center) on the compression stroke for cylinder number one.
  • Remove the timing chain cover and timing chain to access the camshaft.
  • Unbolt the camshaft retaining plate and carefully slide the old camshaft out of the engine.
  • Inspect the old camshaft for wear or damage and clean the camshaft journal area.

Installing the Edelbrock Performer RPM Cam

Now that the old camshaft is removed, you can install the new Edelbrock Performer RPM Cam. Follow these steps for installation:

  • Apply camshaft lubricant to the bearings and the new camshaft lobes.
  • Carefully slide the new camshaft into the engine, ensuring it aligns with the camshaft bearings.
  • Reinstall the camshaft retaining plate and torque the bolts to the manufacturer’s specifications.
  • Reattach the timing chain and timing chain cover, ensuring proper alignment.

Reassembling the Engine

After the camshaft is installed, it’s time to reassemble the engine. Follow these steps:

  • Reinstall the valve covers and intake manifold, applying new gaskets as needed.
  • Reconnect any components that were removed, such as the throttle linkage and vacuum lines.
  • Check all connections and ensure everything is secure.

Final Steps

Once the engine is reassembled, there are a few final steps to complete:

  • Reconnect the negative battery terminal.
  • Start the engine and allow it to idle for a few minutes while checking for any leaks or unusual noises.
  • Take the vehicle for a test drive to ensure everything is functioning correctly.

Conclusion

Installing the Edelbrock Performer RPM Cam on your Chevy 350 can significantly improve engine performance. By following this step-by-step guide, you can ensure a successful installation and enjoy the benefits of enhanced power and efficiency.