Table of Contents
The Mercedes-Benz W204 C63 AMG is a performance vehicle that captivates car enthusiasts with its powerful engine and dynamic handling. However, for those looking to elevate their driving experience even further, the APR Stage 2 Turbocharger Kit offers an excellent solution. This guide will provide detailed steps for installing the turbocharger kit, ensuring improved power and handling for your C63.
Tools and Materials Needed
- APR Stage 2 Turbocharger Kit
- Socket set (including deep sockets)
- Torque wrench
- Screwdrivers (flathead and Phillips)
- Pliers
- Wrenches (various sizes)
- Engine oil
- Coolant
- New gaskets and seals
- Shop towels
- Safety glasses and gloves
Preparation Steps
Before beginning the installation, it’s essential to prepare your workspace and the vehicle. Follow these steps to ensure a smooth process:
- Park the vehicle on a flat surface and engage the parking brake.
- Disconnect the battery by removing the negative terminal.
- Allow the engine to cool completely to avoid burns.
- Gather all tools and materials in your workspace.
Removing the Stock Turbocharger
To install the APR Stage 2 Turbocharger, the first step is to remove the stock turbocharger. Follow these instructions:
- Remove the engine cover by unscrewing the fasteners.
- Disconnect the intake piping connected to the stock turbocharger.
- Remove the exhaust manifold by unbolting it from the cylinder head.
- Disconnect the oil feed and return lines from the stock turbocharger.
- Carefully unbolt the turbocharger from its mounting points and remove it from the engine bay.
Installing the APR Stage 2 Turbocharger
With the stock turbocharger removed, you can now proceed to install the APR Stage 2 Turbocharger. Follow these steps:
- Position the APR turbocharger in place and align it with the mounting points.
- Secure the turbocharger by tightening the bolts to the manufacturer’s specifications using a torque wrench.
- Reconnect the oil feed and return lines to the new turbocharger.
- Install the new exhaust manifold, ensuring proper alignment and sealing.
- Reconnect the intake piping to the APR turbocharger.
Final Steps and Testing
After the installation is complete, you need to perform a few final steps before testing your vehicle:
- Double-check all connections and fittings for tightness.
- Reconnect the battery by attaching the negative terminal.
- Refill engine oil and coolant as needed.
- Start the engine and let it idle for a few minutes to check for leaks.
- Take the vehicle for a test drive to ensure everything is functioning correctly.
Conclusion
Installing the APR Stage 2 Turbocharger Kit on your W204 C63 AMG can significantly enhance its performance and handling. By following this guide, you can ensure a successful installation and enjoy the benefits of increased power and driving dynamics. Always remember to perform regular maintenance checks and consult with a professional if you encounter any issues during the installation process.