Table of Contents
Upgrading your vehicle’s performance can be an exciting project, especially when it comes to installing a COMP Cams Xtreme Energy Camshaft. This modification can yield impressive horsepower gains—up to 50 HP in some cases. In this guide, we will walk you through the step-by-step process to install this camshaft, ensuring you achieve optimal results.
Tools and Materials Needed
- COMP Cams Xtreme Energy Camshaft
- Socket set
- Torque wrench
- Camshaft installation tool
- Engine oil
- Timing chain or belt (if applicable)
- Gasket set
- Rags for cleanup
Preparation Steps
Before you begin the installation, it’s crucial to prepare your workspace and gather all necessary tools and materials. Follow these steps to ensure a smooth process:
- Ensure the engine is cool and the vehicle is parked on a flat surface.
- Disconnect the negative battery cable to prevent any electrical issues.
- Remove any components obstructing access to the camshaft, such as the intake manifold and valve covers.
- Drain the engine oil to prevent spills during the installation.
Removing the Old Camshaft
With the engine prepped, you can now proceed to remove the old camshaft. Follow these steps carefully:
- Remove the timing chain or belt, noting its orientation for reinstallation.
- Unbolt and remove the old camshaft using the appropriate socket size.
- Inspect the old camshaft for wear and damage, and clean the camshaft journal area.
Installing the COMP Cams Xtreme Energy Camshaft
Now that the old camshaft is out, it’s time to install the new COMP Cams Xtreme Energy Camshaft:
- Apply engine oil to the journals of the new camshaft to ensure proper lubrication during startup.
- Carefully slide the new camshaft into the engine, aligning it with the camshaft bearings.
- Secure the camshaft in place with the bolts, using a torque wrench to tighten them to the manufacturer’s specifications.
- Reinstall the timing chain or belt, ensuring it is properly aligned with the timing marks.
Reassembling the Engine
After the camshaft is installed, you’ll need to reassemble the engine components that were removed:
- Replace the valve covers and intake manifold, ensuring all gaskets are in good condition.
- Reconnect any electrical connections and hoses that were disconnected during the removal process.
- Fill the engine with fresh oil, following the manufacturer’s recommendations for oil type and capacity.
Final Checks and Start-Up
Before starting the engine, perform the following final checks:
- Double-check all bolts and connections to ensure they are secure.
- Verify that the timing chain or belt is properly tensioned.
- Reconnect the negative battery cable.
With everything in place, it’s time to start the engine. Monitor for any unusual noises or leaks during the initial run. If everything sounds good, you’re ready to hit the road and enjoy your new horsepower gains!
Tuning Your Engine
After installing the new camshaft, it is advisable to tune your engine to maximize performance. Consider the following:
- Adjust the fuel map to ensure optimal air-fuel mixture.
- Consider upgrading other components such as the exhaust system for better airflow.
- Consult with a professional tuner for best results.
Conclusion
Installing a COMP Cams Xtreme Energy Camshaft can significantly enhance your engine’s performance, potentially adding up to 50 HP. By following this step-by-step guide, you can ensure a successful installation and enjoy the benefits of your hard work. Always remember to perform regular maintenance and tuning to keep your engine running at its best.