Table of Contents
The 13B-REW engine swap has become a popular choice among car enthusiasts looking to boost their vehicle’s performance without breaking the bank. This article will guide you through the steps to install a 13B-REW engine in your vehicle, aiming for a budget build under $3,000 while achieving around 350 horsepower.
Understanding the 13B-REW Engine
The 13B-REW is a renowned rotary engine produced by Mazda. Known for its lightweight design and high-revving capabilities, it offers an exciting driving experience. Here are some key features:
- Displacement: 1.3 liters
- Power Output: Approximately 280 hp in stock form
- Lightweight Design: Weighs less than traditional piston engines
- High RPM Capability: Can rev up to 9,000 RPM
Budget Breakdown
Staying under a $3,000 budget is challenging, but it can be done with careful planning. Here’s a breakdown of estimated costs:
- 13B-REW Engine: $1,500
- Transmission: $500
- Wiring Harness: $300
- ECU: $400
- Miscellaneous Parts (mounts, fluids, etc.): $300
Required Tools and Equipment
Before starting the installation, gather the necessary tools and equipment:
- Socket Set
- Wrenches
- Engine Hoist
- Jack and Jack Stands
- Torque Wrench
- Wire Strippers and Crimpers
- Basic Hand Tools
Preparation for the Swap
Before beginning the swap, ensure your vehicle is ready. Follow these steps:
- Remove the existing engine and transmission.
- Clean the engine bay thoroughly.
- Inspect and replace any worn components.
- Gather all necessary parts for the 13B-REW swap.
Installing the 13B-REW Engine
Now that you are prepared, follow these steps to install the 13B-REW engine:
- Attach the engine mounts to the 13B-REW engine.
- Use the engine hoist to lift the engine into the vehicle.
- Secure the engine mounts to the chassis.
- Connect the transmission to the engine.
Wiring and Electrical Setup
Wiring the 13B-REW engine is crucial for its operation. Follow these guidelines:
- Install the new wiring harness according to the manufacturer’s instructions.
- Connect the ECU and ensure all sensors are properly wired.
- Double-check all connections for security and accuracy.
Final Steps and Testing
Once the engine is installed and wired, it’s time for final checks and testing:
- Fill the engine with oil and coolant.
- Check all fluid levels and connections.
- Start the engine and listen for any unusual sounds.
- Test drive the vehicle to ensure proper performance.
Conclusion
Installing a 13B-REW engine can be a rewarding project for any car enthusiast. With careful planning and execution, achieving a budget build under $3,000 with 350 hp is possible. Enjoy the thrill of your newly swapped engine and the unique driving experience it offers!