Installing the Cobb Tuning Power Package on G87 M2: a Complete Step-by-step Guide

The G87 M2 is a remarkable vehicle that combines performance and style. Installing the COBB Tuning Power Package can significantly enhance its capabilities. This guide will walk you through each step of the installation process to ensure you get the most out of your vehicle.

What You Will Need

  • COBB Tuning Power Package
  • Basic hand tools (screwdrivers, wrenches, etc.)
  • Torque wrench
  • Safety glasses
  • Gloves
  • Access to a lift or jack stands

Preparation Steps

Before starting the installation, it’s essential to prepare your workspace and gather all necessary tools. Make sure the vehicle is parked on a flat surface and the engine is cool.

Gather Your Tools

Ensure you have all the tools listed above. Having everything ready will make the installation process smoother and quicker.

Safety First

Wear safety glasses and gloves to protect yourself during the installation. It’s important to prioritize safety at all times.

Step-by-Step Installation Process

Step 1: Remove the Stock Air Intake

Begin by disconnecting the battery. Then, remove the stock air intake system. This typically involves loosening clamps and unbolting the intake from the throttle body.

Step 2: Install the COBB Air Intake

Take the COBB air intake and position it in place of the stock intake. Ensure that all clamps are tightened securely, and the intake is properly seated on the throttle body.

Step 3: Install the COBB Intercooler

Next, remove the stock intercooler. Install the COBB intercooler by following the provided instructions, ensuring all connections are secure and leak-free.

Step 4: Connect the Charge Pipes

Attach the charge pipes that come with the COBB Power Package. Make sure they are connected firmly and that there are no gaps that could lead to boost leaks.

Step 5: Install the COBB Accessport

Connect the COBB Accessport to the vehicle’s OBD-II port. Follow the on-screen instructions to flash the vehicle’s ECU with the new tuning parameters.

Step 6: Reconnect the Battery

After all components are installed, reconnect the battery. Double-check all connections and ensure that everything is secure.

Post-Installation Checks

Once the installation is complete, it’s crucial to perform a few checks to ensure everything is functioning correctly.

Check for Leaks

Inspect all connections for any signs of leaks, especially around the intercooler and charge pipes. Address any issues before starting the engine.

Test Drive the Vehicle

Take the vehicle for a test drive to ensure that everything is working as expected. Pay attention to any unusual sounds or performance issues.

Conclusion

Installing the COBB Tuning Power Package on your G87 M2 can greatly enhance performance and driving experience. By following this step-by-step guide, you can confidently complete the installation and enjoy the benefits of improved power and efficiency.