Table of Contents
The HKS High-Flow Turbocharger is a popular upgrade for the Hyundai Elantra N, providing enhanced performance and power. This guide will walk you through the complete installation process step-by-step, ensuring you have all the information needed to successfully install this turbocharger.
Tools and Materials Required
- HKS High-Flow Turbocharger
- Socket set
- Torque wrench
- Wrenches
- Screwdrivers
- Gasket scraper
- Replacement gaskets
- Engine oil
- Coolant
- Safety glasses
- Mechanic gloves
Preparation Steps
Before starting the installation, ensure the vehicle is parked on a level surface and the engine is cool. Gather all necessary tools and materials to avoid interruptions during the process.
1. Disconnect the Battery
Begin by disconnecting the negative terminal of the battery. This step is crucial to prevent any electrical shorts during the installation.
2. Remove Engine Cover
Using a socket wrench, remove the bolts securing the engine cover. Gently lift the cover off and set it aside.
Turbocharger Removal
Next, you will need to remove the factory turbocharger to make way for the HKS unit.
1. Remove the Exhaust Manifold
Locate the exhaust manifold and use a wrench to remove the bolts. Be sure to keep track of the bolts for reinstallation.
2. Disconnect Turbocharger Lines
Carefully disconnect the oil feed and return lines from the turbocharger. Be prepared for some oil spillage, so have a rag handy.
3. Remove the Turbocharger
Once the lines are disconnected, remove the turbocharger from its mounting. Take care not to damage any surrounding components.
Installing the HKS High-Flow Turbocharger
With the factory turbocharger removed, you can now proceed to install the HKS High-Flow Turbocharger.
1. Prepare the New Turbocharger
Inspect the new turbocharger for any damage and ensure all necessary components are included. Apply a thin layer of engine oil to the turbocharger’s oil inlet.
2. Install the Turbocharger
Position the HKS turbocharger in place and secure it with the mounting bolts. Use a torque wrench to tighten the bolts to the manufacturer’s specifications.
3. Reconnect Oil Lines
Reconnect the oil feed and return lines to the new turbocharger. Ensure they are tightened properly to prevent leaks.
4. Reinstall the Exhaust Manifold
Reattach the exhaust manifold, making sure to use new gaskets for a proper seal. Tighten the bolts securely.
Final Steps
After installing the turbocharger, there are a few final steps to complete the process.
1. Reattach Engine Cover
Place the engine cover back on and secure it with the bolts removed earlier.
2. Reconnect the Battery
Reconnect the negative terminal of the battery. Ensure it is secured tightly.
3. Check Fluid Levels
Check the engine oil and coolant levels, topping them off as necessary.
4. Start the Engine
Start the engine and let it idle for a few minutes. Check for any leaks around the turbocharger and oil lines.
Conclusion
Installing the HKS High-Flow Turbocharger on your Elantra N can significantly enhance your vehicle’s performance. By following this step-by-step guide, you can ensure a successful installation and enjoy the benefits of increased power and efficiency.