Installing the Hks High-flow Turbocharger on Your Elantra N: Complete Step-by-step Guide

The HKS High-Flow Turbocharger is a popular upgrade for the Hyundai Elantra N, providing enhanced performance and power. This guide will walk you through the complete installation process step-by-step, ensuring you have all the information needed to successfully install this turbocharger.

Tools and Materials Required

  • HKS High-Flow Turbocharger
  • Socket set
  • Torque wrench
  • Wrenches
  • Screwdrivers
  • Gasket scraper
  • Replacement gaskets
  • Engine oil
  • Coolant
  • Safety glasses
  • Mechanic gloves

Preparation Steps

Before starting the installation, ensure the vehicle is parked on a level surface and the engine is cool. Gather all necessary tools and materials to avoid interruptions during the process.

1. Disconnect the Battery

Begin by disconnecting the negative terminal of the battery. This step is crucial to prevent any electrical shorts during the installation.

2. Remove Engine Cover

Using a socket wrench, remove the bolts securing the engine cover. Gently lift the cover off and set it aside.

Turbocharger Removal

Next, you will need to remove the factory turbocharger to make way for the HKS unit.

1. Remove the Exhaust Manifold

Locate the exhaust manifold and use a wrench to remove the bolts. Be sure to keep track of the bolts for reinstallation.

2. Disconnect Turbocharger Lines

Carefully disconnect the oil feed and return lines from the turbocharger. Be prepared for some oil spillage, so have a rag handy.

3. Remove the Turbocharger

Once the lines are disconnected, remove the turbocharger from its mounting. Take care not to damage any surrounding components.

Installing the HKS High-Flow Turbocharger

With the factory turbocharger removed, you can now proceed to install the HKS High-Flow Turbocharger.

1. Prepare the New Turbocharger

Inspect the new turbocharger for any damage and ensure all necessary components are included. Apply a thin layer of engine oil to the turbocharger’s oil inlet.

2. Install the Turbocharger

Position the HKS turbocharger in place and secure it with the mounting bolts. Use a torque wrench to tighten the bolts to the manufacturer’s specifications.

3. Reconnect Oil Lines

Reconnect the oil feed and return lines to the new turbocharger. Ensure they are tightened properly to prevent leaks.

4. Reinstall the Exhaust Manifold

Reattach the exhaust manifold, making sure to use new gaskets for a proper seal. Tighten the bolts securely.

Final Steps

After installing the turbocharger, there are a few final steps to complete the process.

1. Reattach Engine Cover

Place the engine cover back on and secure it with the bolts removed earlier.

2. Reconnect the Battery

Reconnect the negative terminal of the battery. Ensure it is secured tightly.

3. Check Fluid Levels

Check the engine oil and coolant levels, topping them off as necessary.

4. Start the Engine

Start the engine and let it idle for a few minutes. Check for any leaks around the turbocharger and oil lines.

Conclusion

Installing the HKS High-Flow Turbocharger on your Elantra N can significantly enhance your vehicle’s performance. By following this step-by-step guide, you can ensure a successful installation and enjoy the benefits of increased power and efficiency.