Upgrading the Ls7’s Valve Train for Better Durability and 50+ Additional Hp

The LS7 engine, known for its performance and power, can be further enhanced by upgrading its valve train. These modifications not only improve durability but can also yield an additional 50+ horsepower. This article will explore the benefits, components, and steps involved in upgrading the LS7’s valve train.

Understanding the LS7 Engine

The LS7 engine is a 7.0-liter V8 engine produced by General Motors. It is renowned for its high-revving capabilities and impressive power output, making it a favorite among performance enthusiasts. However, to maximize its potential, especially in high-performance applications, upgrading the valve train is essential.

Benefits of Upgrading the Valve Train

  • Increased Durability: Upgraded components can withstand higher RPMs and reduce wear.
  • Improved Performance: Enhanced airflow and valve timing can lead to significant horsepower gains.
  • Better Reliability: Reduces the risk of valve float and other issues associated with stock components.

Key Components to Upgrade

  • Valves: High-performance valves are crucial for better airflow and durability.
  • Valve Springs: Upgraded springs help maintain pressure and prevent valve float.
  • Retainers: Lightweight retainers reduce overall mass and improve response.
  • Cams: Performance camshafts can optimize valve timing for increased power.

Steps to Upgrade the LS7 Valve Train

Step 1: Gather Necessary Tools and Parts

Before starting the upgrade, ensure you have all necessary tools and parts. This includes a socket set, torque wrench, valve spring compressor, and the upgraded valve train components.

Step 2: Remove the Cylinder Heads

Begin by removing the intake manifold and disconnecting any electrical connections. Then, unbolt and lift off the cylinder heads to access the valve train components.

Step 3: Replace the Valves and Springs

Using a valve spring compressor, remove the stock valves and springs. Replace them with the upgraded valves and springs, ensuring they are properly seated and secured.

Step 4: Install New Retainers and Cams

After installing the new valves and springs, place the new retainers on top of the springs. Next, install the performance camshaft according to the manufacturer’s specifications.

Step 5: Reassemble the Engine

Once all components are replaced, reassemble the engine by carefully reinstalling the cylinder heads and intake manifold. Ensure all bolts are torqued to the manufacturer’s specifications for optimal performance.

Tuning for Maximum Performance

After upgrading the valve train, it is crucial to tune the engine to maximize the benefits of the new components. This may involve adjusting the fuel map, ignition timing, and other parameters to ensure optimal performance and reliability.

Conclusion

Upgrading the LS7’s valve train is a significant step towards enhancing its performance and durability. With the right components and proper installation, enthusiasts can achieve over 50 additional horsepower, making their LS7 even more formidable on the road or track.